Wakulla River Bridge Replacement Project

 

 

 Link: Archived Photos June 2009 to January 2010

 

 

Current Photos:

 

Feb 2010

Moving Pile Hammer

 

 

Removing Shoring for Subsoil Exc.

 

   
Removing Soldier Pile from Shoring

 

Temp Platform, Bents 1 and 2

 

 

   

March 2010

Rock Coring at Bent 7

 

 

Drilled Shaft Rig at Bent 5

 

   
Concrete Pump Bent 5

 

Pumping Concrete Bent 7

 

 

Shaft Inspection Device

 

Test Shaft SID

 

 

   

April 2010

Bent 5

 

 

Pumping Concrete

 

   
Pumping Concrete Bent 5

 

Drilled Shaft and Cap Work

 

 

May 2010

Placing Concrete Bent 3

 

 

New Bridge Alignment

 

   
Setting forms Bent 7

 

Bent 7

 

 

June 2010

Placing Type III Beams

 

 

Beams

 

   
Placing Diaphragms

 

Stay In Place Decking

 

 

July-Sept 2010

Subgrade

 

 

Limerock Base

 

   
Placing French Drain - Stormwater Treatment

 

Wakulla River Bridge

 

 

Approach Slab Reinforcement

 

 

Approach Slab Concrete

 

   
Bridge Deck Concrete

 

Bridge Deck Curing Compound

 

 

 

 